The Project consists of the establishment of offices on 8 floors. As it is very repetitive work, Lean Construction methodology is proposed from the start. In the Pull Sessions with the most important suppliers the target is set of completing each floor in 8 weeks.
Thanks to the detailed planning of Lean and the shipping logistics, a large part of the work is done in the shop, thus eliminating on-site downtime and the entire assembly is accelerated.



Grupo Construcía completes the structure of the Holiday Inn Sabadell promoted by Europa-Center Iberia
Circular Construction
El CDTI invierte junto con Grupo Construcía, Meroil, Nolabey Grup y Evolvia en una empresa referente en revalorización de residuos de celulosa, Honext Materials, S.L.
Lean
El IV Foro de Construcción Circular se celebrará en Barcelona para abordar los desafíos del entorno construido a nivel internacional
Circular economy
Primark confía en Grupo Construcía para su más reciente apertura en el barrio Goya de Madrid
Retail
Políticas de suficiencia: rehabilitar antes que construir
Circular Construction
Grupo Construcía y Hilti unen fuerzas para avanzar en la construcción sostenible
Colaboración
Transforma tu espacio de trabajo en un entorno saludable y sostenible
Circular Construction
5 claves para alinear la construcción con la Taxonomía Europea
Circular economy
Los grandes hitos del 2023 en la evolución hacia una construcción positiva para el futuro
Circular economy
COP28: entre el avance histórico y las lagunas críticas
Uncategorized
Suscríbete a nuestra newsletter para saber más sobre nosotros