To carry out the project, the latest technologies in the sector were applied and installed in all the different types of installations. The Lean2Cradle® methodology was also applied with initial pull sessions and continuous revision of the planning. In addition, the BIM methodology was used in the initial model.
Project Scope:
– Low-voltage electrical installations.
– Medium-voltage electrical installations.
– Special installations (PA system, closed-circuit television, access control…).
– Mechanical installations (hydraulic network, extraction and ventilation, Building Management System).
– Fire protection installations.
The most characteristic part of the project was its compliance with the high-quality standards (energy efficiency, safety and high availability) and adaptation to the demanding work pace.



Grupo Construcía completes the structure of the Holiday Inn Sabadell promoted by Europa-Center Iberia
Circular Construction
El CDTI invierte junto con Grupo Construcía, Meroil, Nolabey Grup y Evolvia en una empresa referente en revalorización de residuos de celulosa, Honext Materials, S.L.
Lean
El IV Foro de Construcción Circular se celebrará en Barcelona para abordar los desafíos del entorno construido a nivel internacional
Circular economy
Primark confía en Grupo Construcía para su más reciente apertura en el barrio Goya de Madrid
Retail
Políticas de suficiencia: rehabilitar antes que construir
Circular Construction
Grupo Construcía y Hilti unen fuerzas para avanzar en la construcción sostenible
Colaboración
Transforma tu espacio de trabajo en un entorno saludable y sostenible
Circular Construction
5 claves para alinear la construcción con la Taxonomía Europea
Circular economy
Los grandes hitos del 2023 en la evolución hacia una construcción positiva para el futuro
Circular economy
COP28: entre el avance histórico y las lagunas críticas
Uncategorized
Suscríbete a nuestra newsletter para saber más sobre nosotros