The project consisted of the remodelling of the locker rooms, the cafeteria, the Jacuzzi and the sauna area, the poolside area of the heated pool and the chill out area, with the aim of giving the space a makeover.
The facilities remained open to the public while the work was being done, which required making an extra effort to cause users minimal inconvenience in their use of the facilities. By maintaining order and cleanliness in all areas, the gym’s day-to-day activities were hardly affected.
Thanks to the application of the Lean methodology, the work was effectively planned out, meeting deadlines and helping to coordinate all those involved in the project. In addition, with the spaciousness of the locker room areas and the changes made to the pool lighting, its occupants’ well-being was improved.



Grupo Construcía completes the structure of the Holiday Inn Sabadell promoted by Europa-Center Iberia
Circular Construction
El CDTI invierte junto con Grupo Construcía, Meroil, Nolabey Grup y Evolvia en una empresa referente en revalorización de residuos de celulosa, Honext Materials, S.L.
Lean
El IV Foro de Construcción Circular se celebrará en Barcelona para abordar los desafíos del entorno construido a nivel internacional
Circular economy
Primark confía en Grupo Construcía para su más reciente apertura en el barrio Goya de Madrid
Retail
Políticas de suficiencia: rehabilitar antes que construir
Circular Construction
Grupo Construcía y Hilti unen fuerzas para avanzar en la construcción sostenible
Colaboración
Transforma tu espacio de trabajo en un entorno saludable y sostenible
Circular Construction
5 claves para alinear la construcción con la Taxonomía Europea
Circular economy
Los grandes hitos del 2023 en la evolución hacia una construcción positiva para el futuro
Circular economy
COP28: entre el avance histórico y las lagunas críticas
Uncategorized
Suscríbete a nuestra newsletter para saber más sobre nosotros