Complete remodelling of the toilets, the food court area with hanging elements and a large advertising screen; elimination of the moving walkway and implementation of new escalators and elevator, remodelling of the entire outdoor area, execution of a large entrance portico and painting of the exterior perimeter and the entire interior.
Application of the Lean methodology.
The project was carried out while the shopping centre remained open and in use. The biggest challenge was to make the openings in the floor slabs to install the reinforcements of the new stairs and elevators.
Greater accessibility between floors was achieved, contributing to the well-being of the users of the space.



Grupo Construcía completes the structure of the Holiday Inn Sabadell promoted by Europa-Center Iberia
Circular Construction
El CDTI invierte junto con Grupo Construcía, Meroil, Nolabey Grup y Evolvia en una empresa referente en revalorización de residuos de celulosa, Honext Materials, S.L.
Lean
El IV Foro de Construcción Circular se celebrará en Barcelona para abordar los desafíos del entorno construido a nivel internacional
Circular economy
Primark confía en Grupo Construcía para su más reciente apertura en el barrio Goya de Madrid
Retail
Políticas de suficiencia: rehabilitar antes que construir
Circular Construction
Grupo Construcía y Hilti unen fuerzas para avanzar en la construcción sostenible
Colaboración
Transforma tu espacio de trabajo en un entorno saludable y sostenible
Circular Construction
5 claves para alinear la construcción con la Taxonomía Europea
Circular economy
Los grandes hitos del 2023 en la evolución hacia una construcción positiva para el futuro
Circular economy
COP28: entre el avance histórico y las lagunas críticas
Uncategorized
Suscríbete a nuestra newsletter para saber más sobre nosotros