{"id":4522,"date":"2019-04-29T11:49:39","date_gmt":"2019-04-29T09:49:39","guid":{"rendered":"https:\/\/sftp.construcia.com\/oficinas-haya-real-estate\/"},"modified":"2020-05-07T18:29:24","modified_gmt":"2020-05-07T16:29:24","slug":"haya-real-estate-offices","status":"publish","type":"post","link":"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/","title":{"rendered":"Construc\u00eda installs the new offices of Haya Real Estate"},"content":{"rendered":"<p><strong>The project, based on the Lean to Cradle methodology, consisted of the renovation of 8000m\u00b2 in only 4 months.<\/strong><\/p>\n<p>Offices that are more dynamic, flexible, integrative and that will show their identity. These were the main needs of\u00a0<strong>HAYA Real Estate<\/strong>\u00a0for their new offices, a need linked to the continuous growth of the group and for which they have placed their trust in the experience of <strong>Grupo Construc\u00eda<\/strong>\u00a0and in its pioneering criteria of design and construction based on the circular economy.<\/p>\n<p>Previously, through the builder consultant\u00a0<strong>Leesman,<\/strong>\u00a0the main priorities were analysed for which the employees of <strong>HAYA Real Estate\u00a0<\/strong>needed to have the office. Among the main challenges posed were the reduction of the office noise levels, the creation of quiet spaces for better concentration on tasks, and improving the decoration along with an increase of green zones.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter wp-image-2961 size-large\" src=\"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/03\/GManera_Construcia_HayaRealEstate_Alta_073-1024x683.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/03\/GManera_Construcia_HayaRealEstate_Alta_073-1024x683.jpg 1024w, https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/03\/GManera_Construcia_HayaRealEstate_Alta_073-975x650.jpg 975w, https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/03\/GManera_Construcia_HayaRealEstate_Alta_073-1980x1320.jpg 1980w, https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/03\/GManera_Construcia_HayaRealEstate_Alta_073-300x200.jpg 300w, https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/03\/GManera_Construcia_HayaRealEstate_Alta_073-768x512.jpg 768w, https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/03\/GManera_Construcia_HayaRealEstate_Alta_073-220x147.jpg 220w, https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/03\/GManera_Construcia_HayaRealEstate_Alta_073-700x467.jpg 700w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p><strong>Implanta<\/strong>, the architecture company of <strong>Grupo Construc\u00eda<\/strong>, introduced the\u00a0 \u00a0<strong>Lean to Cradle\u00a0<\/strong>methodology in the design for <strong>HAYA Real Estate,<\/strong>\u00a0that aims to achieve healthier spaces and improve people\u2019s productivity, as well as their comfort, while promoting communication and collaboration between the workers. In the design, the concepts of active design, improvement of acoustics and environmental conditions, lighting and air quality have been taken into account, as well as a natural design, all factors that have a direct impact on the quality of life of the people who work there.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter wp-image-2959 size-large\" src=\"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/03\/GManera_Construcia_HayaRealEstate_Alta_049-1024x683.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/03\/GManera_Construcia_HayaRealEstate_Alta_049-1024x683.jpg 1024w, https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/03\/GManera_Construcia_HayaRealEstate_Alta_049-975x650.jpg 975w, https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/03\/GManera_Construcia_HayaRealEstate_Alta_049-1980x1320.jpg 1980w, https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/03\/GManera_Construcia_HayaRealEstate_Alta_049-300x200.jpg 300w, https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/03\/GManera_Construcia_HayaRealEstate_Alta_049-768x512.jpg 768w, https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/03\/GManera_Construcia_HayaRealEstate_Alta_049-220x147.jpg 220w, https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/03\/GManera_Construcia_HayaRealEstate_Alta_049-700x467.jpg 700w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>The project was carried out using <strong>Cradle to Cradle <\/strong>materials, which is the most demanding certification in the product quality standards and involves recyclable and toxic-free materials.<\/p>\n<p>The <strong>8,000m<sup>2<\/sup><\/strong>\u00a0of the work are divided into 8 plants: a ground floor of common areas, six floors of offices, and a semibasement, which is used as an entrance to the facilities and car park.<\/p>\n<p>Located on the ground floor are the canteen\/caf\u00e9 and the kitchen and a space designed as a meeting point for the workers. There is also a terrace with tables, to eat outdoors, two gyms and an infirmary. In addition, there are versatile meeting rooms of different sizes, for events or trainings and a work area for external personnel.<\/p>\n<p>The office floors have a similar plan among them, with offices providing great comfort. In addition, the areas of greater transit have been separated from the work areas by open spaces for meetings, vending areas and reprography areas.<\/p>\n<p>The evaluation of the project to see if it complies with the criteria of efficiency and adaptation to the needs of the workers will be known at 6 months after key handover when <strong>Leesman\u00a0 <\/strong>will carry out a survey of the employees to evaluate their level of satisfaction with the renovation.<\/p>\n<p><strong>Construc\u00eda\u00a0 <\/strong>has used the \u00a0<a href=\"http:\/\/construcia-stg.servidortemporal.net\/que-es-lean-construction\/\"><strong>Lean Construction<\/strong><\/a><strong> method<\/strong>\u00a0 to carry out the work. Thanks to this method, it was possible to complete the project, of approximately 8,000m<sup>2<\/sup>\u00a0in a record time of only\u00a0<strong>4 months<\/strong>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The project, based on the Lean to Cradle methodology, consisted of the renovation of 8000m\u00b2 in only 4 months. Offices that are more dynamic, flexible, integrative and that will show their identity. These were the main needs of\u00a0HAYA Real Estate\u00a0for their new offices, a need linked to the continuous growth of the group and for [&hellip;]<\/p>\n","protected":false},"author":17,"featured_media":5032,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[158,168,200],"tags":[159,195,223,234],"class_list":["post-4522","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economia-circular-en","category-lean-en","category-construccion-circular-en","tag-construcia-en","tag-reutilizacion-en","tag-circular-economy","tag-reuse"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Construc\u00eda installs the new offices of Haya Real Estate<\/title>\n<meta name=\"description\" content=\"The project, based on the Lean to Cradle methodology, which is the most demanding certification in the product quality standards.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construc\u00eda installs the new offices of Haya Real Estate\" \/>\n<meta property=\"og:description\" content=\"The project, based on the Lean to Cradle methodology, which is the most demanding certification in the product quality standards.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/\" \/>\n<meta property=\"og:site_name\" content=\"Construc\u00eda\" \/>\n<meta property=\"article:published_time\" content=\"2019-04-29T09:49:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-05-07T16:29:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/04\/GManera_Construcia_HayaRealEstate_Alta_012-compressor.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1280\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"alice dessaint\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"alice dessaint\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/\"},\"author\":{\"name\":\"alice dessaint\",\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/#\/schema\/person\/92d6c103eacf0f83c47d68b8b8e876aa\"},\"headline\":\"Construc\u00eda installs the new offices of Haya Real Estate\",\"datePublished\":\"2019-04-29T09:49:39+00:00\",\"dateModified\":\"2020-05-07T16:29:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/\"},\"wordCount\":485,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/04\/GManera_Construcia_HayaRealEstate_Alta_012-compressor.jpg\",\"keywords\":[\"Construcia\",\"reutilizaci\u00f3n\",\"circular economy\",\"reuse\"],\"articleSection\":[\"Circular economy\",\"Lean\",\"Circular Construction\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/\",\"url\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/\",\"name\":\"Construc\u00eda installs the new offices of Haya Real Estate\",\"isPartOf\":{\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/04\/GManera_Construcia_HayaRealEstate_Alta_012-compressor.jpg\",\"datePublished\":\"2019-04-29T09:49:39+00:00\",\"dateModified\":\"2020-05-07T16:29:24+00:00\",\"description\":\"The project, based on the Lean to Cradle methodology, which is the most demanding certification in the product quality standards.\",\"breadcrumb\":{\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/#primaryimage\",\"url\":\"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/04\/GManera_Construcia_HayaRealEstate_Alta_012-compressor.jpg\",\"contentUrl\":\"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/04\/GManera_Construcia_HayaRealEstate_Alta_012-compressor.jpg\",\"width\":1920,\"height\":1280,\"caption\":\"construcia oficina lean to cradle material passport\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construc\u00eda installs the new offices of Haya Real Estate\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/#website\",\"url\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/\",\"name\":\"Construc\u00eda\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/#organization\",\"name\":\"Construc\u00eda\",\"url\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2018\/06\/logo-construcia-ok.png\",\"contentUrl\":\"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2018\/06\/logo-construcia-ok.png\",\"width\":327,\"height\":66,\"caption\":\"Construc\u00eda\"},\"image\":{\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/#\/schema\/person\/92d6c103eacf0f83c47d68b8b8e876aa\",\"name\":\"alice dessaint\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/construcia-stg.servidortemporal.net\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/3718f3a7bcbae3a76f1e8d8c2d5dc2582e303c0f259e767c81409b7e8a9b176d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/3718f3a7bcbae3a76f1e8d8c2d5dc2582e303c0f259e767c81409b7e8a9b176d?s=96&d=mm&r=g\",\"caption\":\"alice dessaint\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construc\u00eda installs the new offices of Haya Real Estate","description":"The project, based on the Lean to Cradle methodology, which is the most demanding certification in the product quality standards.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Construc\u00eda installs the new offices of Haya Real Estate","og_description":"The project, based on the Lean to Cradle methodology, which is the most demanding certification in the product quality standards.","og_url":"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/","og_site_name":"Construc\u00eda","article_published_time":"2019-04-29T09:49:39+00:00","article_modified_time":"2020-05-07T16:29:24+00:00","og_image":[{"width":1920,"height":1280,"url":"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/04\/GManera_Construcia_HayaRealEstate_Alta_012-compressor.jpg","type":"image\/jpeg"}],"author":"alice dessaint","twitter_card":"summary_large_image","twitter_misc":{"Written by":"alice dessaint","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/#article","isPartOf":{"@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/"},"author":{"name":"alice dessaint","@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/#\/schema\/person\/92d6c103eacf0f83c47d68b8b8e876aa"},"headline":"Construc\u00eda installs the new offices of Haya Real Estate","datePublished":"2019-04-29T09:49:39+00:00","dateModified":"2020-05-07T16:29:24+00:00","mainEntityOfPage":{"@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/"},"wordCount":485,"commentCount":0,"publisher":{"@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/#organization"},"image":{"@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/#primaryimage"},"thumbnailUrl":"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/04\/GManera_Construcia_HayaRealEstate_Alta_012-compressor.jpg","keywords":["Construcia","reutilizaci\u00f3n","circular economy","reuse"],"articleSection":["Circular economy","Lean","Circular Construction"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/","url":"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/","name":"Construc\u00eda installs the new offices of Haya Real Estate","isPartOf":{"@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/#primaryimage"},"image":{"@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/#primaryimage"},"thumbnailUrl":"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/04\/GManera_Construcia_HayaRealEstate_Alta_012-compressor.jpg","datePublished":"2019-04-29T09:49:39+00:00","dateModified":"2020-05-07T16:29:24+00:00","description":"The project, based on the Lean to Cradle methodology, which is the most demanding certification in the product quality standards.","breadcrumb":{"@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/#primaryimage","url":"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/04\/GManera_Construcia_HayaRealEstate_Alta_012-compressor.jpg","contentUrl":"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2019\/04\/GManera_Construcia_HayaRealEstate_Alta_012-compressor.jpg","width":1920,"height":1280,"caption":"construcia oficina lean to cradle material passport"},{"@type":"BreadcrumbList","@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/noticias\/haya-real-estate-offices\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/construcia-stg.servidortemporal.net\/en\/"},{"@type":"ListItem","position":2,"name":"Construc\u00eda installs the new offices of Haya Real Estate"}]},{"@type":"WebSite","@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/#website","url":"https:\/\/construcia-stg.servidortemporal.net\/en\/","name":"Construc\u00eda","description":"","publisher":{"@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/construcia-stg.servidortemporal.net\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/#organization","name":"Construc\u00eda","url":"https:\/\/construcia-stg.servidortemporal.net\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/#\/schema\/logo\/image\/","url":"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2018\/06\/logo-construcia-ok.png","contentUrl":"https:\/\/construcia-stg.servidortemporal.net\/wp-content\/uploads\/2018\/06\/logo-construcia-ok.png","width":327,"height":66,"caption":"Construc\u00eda"},"image":{"@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/#\/schema\/person\/92d6c103eacf0f83c47d68b8b8e876aa","name":"alice dessaint","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/construcia-stg.servidortemporal.net\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/3718f3a7bcbae3a76f1e8d8c2d5dc2582e303c0f259e767c81409b7e8a9b176d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3718f3a7bcbae3a76f1e8d8c2d5dc2582e303c0f259e767c81409b7e8a9b176d?s=96&d=mm&r=g","caption":"alice dessaint"}}]}},"_links":{"self":[{"href":"https:\/\/construcia-stg.servidortemporal.net\/en\/wp-json\/wp\/v2\/posts\/4522","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/construcia-stg.servidortemporal.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/construcia-stg.servidortemporal.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/construcia-stg.servidortemporal.net\/en\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/construcia-stg.servidortemporal.net\/en\/wp-json\/wp\/v2\/comments?post=4522"}],"version-history":[{"count":6,"href":"https:\/\/construcia-stg.servidortemporal.net\/en\/wp-json\/wp\/v2\/posts\/4522\/revisions"}],"predecessor-version":[{"id":6952,"href":"https:\/\/construcia-stg.servidortemporal.net\/en\/wp-json\/wp\/v2\/posts\/4522\/revisions\/6952"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/construcia-stg.servidortemporal.net\/en\/wp-json\/wp\/v2\/media\/5032"}],"wp:attachment":[{"href":"https:\/\/construcia-stg.servidortemporal.net\/en\/wp-json\/wp\/v2\/media?parent=4522"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/construcia-stg.servidortemporal.net\/en\/wp-json\/wp\/v2\/categories?post=4522"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/construcia-stg.servidortemporal.net\/en\/wp-json\/wp\/v2\/tags?post=4522"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}